The Project entails the design, tender documentation and adjudication, contract administration and site supervision for the construction of new 40 bed MDR-TB and XDR-TB wards at Bongani TB hospital in the Mbombela Local Municipality.  We were involved in the design of the level platforms on which the buildings would be constructed on the sloping site of works.  We also designed a new bypass road as well as new water, sewer and stormwater networks to cater for the new ward blocks.  An existing water purification plant and holding reservoir were fully rehabilitated.  A new sewer package plant was also installed for the new wards as well as future developments on the site of works.

Start date: December 2009

End date: August 2011